← All projects

A launch board for tracking release checklists, blocked tasks and target dates across projects.

Role
Product design and full-stack engineering
Delivery
Self-hosted VPS + Docker
Availability
Showcase
Templates
Six launch types, 0-12 preset tasks

How it works

TASK STATESTemplatelaunch typeChecklistedited before savingIn progressCompletedBlockedcounted on the cardTable viewprojects side by sideGo-liveevery task doneHORIZON / TEMPLATE TO GO-LIVE

Swipe to see the whole system

  1. Start from a known checklist

    Six launch types bring the right preset tasks into the creation flow. The checklist can be edited before saving, and the public templates page uses the same configuration as the product.

  2. Put launch risk in view

    Deadlines, completion, and blocked tasks sit together on each project. Clear state labels and deliberate contrast make the next action easier to spot.

  3. Compare, then act

    The cross-project table exposes checklist gaps and supports inline task changes. The demo uses the real workflow with fictional projects and a reset action.

The problem

Go-live readiness usually lives in a spreadsheet per client: SSL, DNS, backups, analytics, legal pages, smoke tests. With several launches in flight it is hard to see which one is blocked, which is closest to shipping, and whether every project is being held to the same checklist.

My approach

Horizon starts each launch from a configurable checklist, makes blockers and deadlines visible across projects, and gives teams both a project dashboard and a cross-project task table. The navy-and-amber interface carries through the public website and application. An isolated demo uses the same workspace components, so visitors can create launches, change task states, and explore the workflow without an account.

Engineering scope

  1. Next.js 15 and React 19 with MySQL persistence, NextAuth Google sign-in, and authenticated project/task APIs
  2. Shared dashboard, checklist, and table components behind live and demo data adapters; per-tab demo storage with an in-memory fallback
  3. Configuration-driven templates, optimistic updates with failure recovery, project ordering, archiving, and per-task last-editor tracking